Know the Energy State.
Coordinate the Work.
Preserve the Record.
Electrical topology, isolation relationships and field evidence—connected in one coordinated view for complex construction and commissioning.
Built for the coordination behind mission-critical electrical work.
One operating picture.
Different responsibilities.
See the relationships.
Not just the equipment.
Follow the electrical relationships from incoming supply through switchgear, unit substations, distribution, and work-zone records. Select any asset to explore its connected context.
From incoming supply to a work boundary
Explore modeled electrical relationships.
Modeled construction work context.
Select equipment to inspect its records. Tab + Enter supported.
Facility Distribution / INTERACTIVE MAP
Tap any equipment card to inspect its linked sample record.
CONSTRUCTION · SAMPLE RELATIONSHIPSPreparing interactive system map…
Select a card above to review its fictional relationship and record context.
Illustrative scenario only. Diagram colors describe records—not verified electrical conditions. Approved field procedures remain authoritative.
All equipment and connections are fictional examples.
Work activity determines the requirements.
Illustrative OSHA starting points, not a legal classification, field authorization, or substitute for an employer's applicable procedures.
Rules depend on the installation and work activity.
Topology helps explain the relationship. A qualified person's approved field process determines the condition.
The work is connected.
The records should be, too.
Explore five operating concepts. Select a card to see its proposed records, field-authority boundaries and an interactive commissioning example.
Topology
Understand how sources, equipment and downstream work boundaries relate.
Does not determine live electrical state.Isolation
Associate recorded physical isolation points with scope, people and procedure.
Does not perform physical isolation.Lockboxes
Map digital lockbox records and sign-on relationships to work scope.
Physical locks remain authoritative.Verification
Organize evidence and review history provided by qualified personnel.
Never substitutes for field testing.Handover
Keep unresolved issues, responsibilities and transition records visible.
Requires human review and acceptance.Every transition
has a responsible party.
Coordinate the records and responsibilities across each stage of the energy-control process.
- 01
Plan the scope
Identify equipment, work boundaries and authoritative engineering documents.
- 02
Physically isolate
Qualified personnel execute site-approved energy-control procedures.
- 03
Verify and document
Perform required checks, then associate evidence with the responsible record.
- 04
Transfer context
Communicate pending items, responsibility and continuity across shifts.
Designed for the work
behind the work.
Bring electrical, commissioning, and safety stakeholders into the same conversation. Request an enterprise evaluation for your organization, or create an individual identity to explore ECOS. Project and operational permissions remain separately controlled.